Property Point

Chennai Metro · Red Line (Corridor 5)

Retteri Junction Metro Station: homes within 2 km

Retteri Junction is on the Red Line (Corridor 5) of Chennai Metro. The Red Line (Corridor 5) here is under construction on the Madhavaram – Koyambedu stretch (status checked 20 October 2026). Within 2 km of the station we list 1 new-launch and under-construction project, from ₹2.25 Cr, and 1 ready-to-move.

Within 2 km, nearest first

1 new home near Retteri Junction

ProjectDistanceFrom
VR Livin The FirstVR Livin · Madhavaram4 BHK Villa, 5 BHK Villa · Jul 20301.4 km₹2.25 Cr

Ready-to-move homes within 2 km (1) are not listed here.

The station

Line and status

Red Line (Corridor 5)Under construction
Madhavaram – KoyambeduStatus checked 20 October 2026

How we measured

Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.