Property Point

Chennai Metro · Red Line (Corridor 5)

Butt Road Metro Station: homes within 2 km

Butt Road is on the Red Line (Corridor 5) of Chennai Metro. The Red Line (Corridor 5) here is under construction on the Chennai Trade Centre – Alandur stretch (status checked 20 October 2026). Within 2 km of the station we list 1 new-launch and under-construction project, from ₹1.53 Cr.

Within 2 km, nearest first

1 new home near Butt Road

ProjectDistanceFrom
Isha River FrontIsha Homes · Nandambakkam (Ramapuram)3 BHK · Jan 20311.3 km₹1.53 Cr

The station

Line and status

Red Line (Corridor 5)Under construction
Chennai Trade Centre – AlandurStatus checked 20 October 2026

How we measured

Distances are straight lines from the station point to each project's map pin, not walking or driving routes, rounded to 0.1 km. Station positions and line status come from the sources named above; project details are the developers' information as listed on Property Point (indicative). Prices are shown only for projects with a RERA number on our books.